At a facility assessed by CPE, an installed condensing economizer was recovering less heat than expected. The plant was using more natural gas than anticipated and missing the return expected from its heat-recovery equipment.

Condensing economizer with insulated flue-gas ductwork and an induced-draft fan.
Condensing economizer and connected flue-gas ductwork.

Condensing economizers recover sensible heat as flue gas cools and latent heat as water vapor condenses. The recovered heat can preheat boiler makeup water, reducing the fuel needed to raise steam.

Why air ingress limited heat recovery

The assessment found that cold ambient air could be drawn down the stack and mix with the boiler flue gas before it reached the economizer. This changed the gas temperature and water-vapor concentration entering the exchanger. The existing damper-control arrangement did not prevent the unwanted air path.

Recommended correction and projected benefits

CPE recommended automated isolation dampers above the relevant stack takeoffs, with the associated draft, venting and interlock requirements addressed in the design.

The projected result was approximately 10°F more makeup-water heating and $20,000 to $40,000 in annual natural-gas savings. Those were estimates for the proposed correction, to be verified under comparable operating conditions after installation.

Waste-heat recovery assessments need to consider the source, heat sink and controls together. In this case, the limiting condition was upstream of the exchanger itself.