Industrial processing columns, platforms and insulated piping.
Biomass & Bioenergy / Process Heat

Process Heat for Renewable Diesel Facilities

Boiler, steam-system and heat-recovery engineering matched to your process requirements, from equipment selection through detailed design and procurement support.

Thermal Systems Engineering

Engineer the complete process-heat system

CPE brings the owner's operating cases, the process licensor's requirements and the boiler supplier's package into a coordinated design basis for steam generation, distribution and heat recovery.

Generation

Match boiler duty, fuel specifications and operating range to the required steam conditions and reliability targets.

Distribution and return

Coordinate steam headers, pressure levels, condensate return and feedwater systems with the process users.

Utilization

Compare heating duties and recoverable heat sources across normal operation, startup and turndown.

Design Basis

Select equipment against a defined duty

Define steam flow, pressure and temperature for normal operation, startup and turndown. Confirm available fuels, feedwater conditions and condensate return before developing boiler and fuel specifications.

CPE reviews supplier proposals against the agreed requirements and documents technical comments, redlines and equipment interfaces. The scope can include bid drawings and specifications for procurement. Where biomass supplies process heat, fuel analysis helps establish the expected fuel range.

EXPLORE DETAILED ENGINEERING
Installed industrial heat exchangers, valves and connecting process piping.

Waste Heat Recovery

Match recoverable heat to a useful demand

Use heat and mass balances to compare available heat with the temperature, duty and operating schedule of the receiving process. Evaluate economizer and heat-exchanger options alongside their piping, controls and layout requirements.

For an existing facility, an energy audit can establish current performance and identify where heat is lost.

EXPLORE WASTE HEAT RECOVERY
Economizer module being lifted from a trailer during installation.

Discuss your process-heat requirements

Tell us your project stage, steam requirements and available fuels. We will discuss the engineering scope and information needed for the next decision.